The second phase of the construction of a solar power plant in the Orekhovsky district of the Zaporozhye region has been completed. At present, the power for photomodules is 29.8 kW. The final power of the station should be 36 kW.
The next commissioning of a solar power plant is an excellent alternative to bank loans, because you can increase the capacity at any convenient time.
During the construction of the first stage, our specialists increased the permitted contractual capacity at the customer’s facility and issued a “green” tariff.
Project data:
- Placement on the ground with orientation to the south
- Photomodules Longi Solar (Tier 1, single crystal)
- Fronius Eco 27.0-3S inverter with online monitoring
- Complete set of protection (AC/DC, lightning protection)
- The service life of the panels is from 25 years
- Inverter service life – 25 years
- Projected annual generation after installation of the entire number of modules – 45 MWh
- ROI – 4 years
- Net profit after the end of the payback period – 6990 dollars / year