Solar power plant
30 kW
A 30 kW solar power plant in Orekhov was put into operation and connected to the Green Tariff.
The construction of the first stage has been completed and preparations for the next stage have already begun. Our specialists have successfully passed all stages of interaction with the relevant structural divisions of Oblenergo: increasing the input capacity, completing the necessary documentation and obtaining a signed feed-in tariff agreement.
The next increase in capacity allows us to do without loans and build our own solar power plant at a financial pace convenient for the client.
Project data:
South facing rooftop accommodation
Photomodules Longi LR5-72HPH 540 W (Tier 1, single crystal)
Huawei inverter SUN2000-30KTL-M3 (30kW 3 phase 4 MPPT) with monitoring
Complete set of protection (AC/DC, lightning protection)
The service life of the panels is from 25 years
Inverter service life – 20 years