Solar power plant
30 kW
A 30 kW solar power plant in the Melitopol region was built in 2021.
In addition to the construction itself, our specialists performed full legal support for the facility: increasing capacity, processing all necessary documents and connecting to the “green tariff”.
Project data:
- The power of the station is 27 kW by inverter
- Placement on the ground with orientation to the south
- Fronius Eco 27.0-3S inverter with built-in online monitoring
- Panels – Longi LR4-72HPH 450 (single crystal, Tier 1) – 80 pieces
- The projected annual generation of the station is 45,500 kWh
- The service life of the panels is from 25 years
- Inverter service life – 25 years
- The predicted payback period is 3 years 5 months
Call us and we will calculate the cost / profitability of the installation for free, if necessary, we will form the order of construction and connect the “green tariff”.